System Scope
Designed Around the Risk.
Our approach combines system selection, engineering coordination, equipment supply and technical support around the specific application and project requirements.
FM-200 / HFC-227ea systems where specified
Clean-agent solutions based on project requirements and approved equipment.
FK-5-1-12 and inert gas options where applicable
Waterless suppression options for sensitive or high-value spaces.
Detection, releasing panels and discharge interfaces
Detection and releasing controls coordinated as a complete suppression package.
Nozzle, piping and enclosure coordination
System layout based on protected volume and design criteria.
Design and equipment selection are coordinated with the applicable project specifications, authority requirements and recognized standards such as NFPA, UL/FM and relevant IEC requirements where applicable.

